Hi every one
Here is another example of how to haul and launch boats from a hard stand
this system is used at Granger Point at Bucklands Beach and is run by BBYC
Ok this is pretty much one step up from the setup that was at Devonport which used a winch and greased rails to move the cradles around
In this first picture you can see how the boat is positioned in its arm cradle.
for moving the boats and the cradle a trolley that is moved by a tractor is used. as can be seen the cradle needs to be up on blocks so that the trolley can fit under the cradle.
Once the trolley is in position a hydraulic ram is used on each side to lift the aft end of the cradle and the trolley up so that the large set of wheels can be slid into the slots and then held in position by the steel pins.
Once the wheels have been secured in place the hydraulic rams are removed as well as the block used under the cradle.
As can be seen once the back wheels are in position the whole arrangement can be moved.
From this point the boat is positioned at the top of the ramp and chock blocks are placed behind the back wheels. The tractor is then detached and a long steel cable is put in between the tractor and trolley. The chock blocks are removed and the vessel is slowly let to move down the ramp.
That is pretty much the process and the hauling process is just in reverse
I think I have explained the basic process so if u got any questions just ask